Tuesday, March 6, 2012

06 March 2012

C-shift on deck. Winter Storm Warning. E41 is chained at Sta 5;
E51 is at Sta 4.

Lawrenson is Acting Capt. Thru Thursday.
Engineer: Hay


Wed, A-shift
Thurs, B-shift (Engineer: Lawrenson), Areawide Fire Drill

Monday, March 5, 2012

05 March 2012

B-shift on deck. Winter Storm Warning. E41 is chained at Sta 5;
E51 is at Sta 4.
Engineer: Lawrenson

Tues, C-shift (Engineer: Hay), EMS Drill
Wed, A-shift
Thurs, B-shift (Engineer: Lawrenson), Areawide Fire Drill